Erection on site of 80’‐16.9’ ft Diameter Thickener and 80’x16.9’ ft Elevated Tank with MudMax.
Installation of MudMax Mechanism
Installation of Structural Bridge
Electro/Mechanical Installation
2500 lineal meters of welds
Design and Fabrication Specification : API 650
Date: January 2024
Location: Sonora, México
La Yaqui Grande Project
Fabrication on workshop and Erection on site of over 300 tons of structural steel, 20 process tanks, stairs, and other miscellaneous steel
Over 25 motor/pumps Installations
Electrical Wiring Installations
Instrumentation & Control Installations (over 70 instruments)
Comissioning and Start-Up of Process Plant
Date: August 2022
Location: Sonora, México
La Yaqui Grande Project
-Rehabilitated, resizing of the overland conveyor system (250 meters).
-Dismantling, relocation, and complete installation (structural, mechanical and electrical) of Overland system (250 meters) in leach pads.
Date: September 2022
Location: Sonora, México
La Yaqui Grande Project
Mechanical and Civil Works
-Fabrication and installation of an elevated
metal vacuum tank for the mineral extraction process
-Fabrication and installation of metal
tanks for Barren, Intermediate and Pregnant tanks
-Fabrication and installation of metal
tanks for mixing and distribution of cyanide
-Fabrication and installation of Manifold
with carbon steel pipes, connections and valves of 8' and 12"
-Installation of equipment, carbon steel
pipes s/c vitaulic system, connections and valves at the Merryl Crowe plant to
obtain metals
-Construction of workshop in breaking area. (Metal structure, R-72 pintro sheet roof and concrete floors)
-Construction of maneuver yards in the Mine workshop
-Construction of warehouse for surveying equipment
-Construction and equipping of an area to purify water, wash and fill jugs, and ice production
-Manufacture and installation of access walkways to monitoring points in chimneys in plant generators, chimneys in the foundry area, chimneys in the laboratory area, chimneys in the breaking generator area (metal structures)
-Construction of an anti-dust system in the breaking equipment
-Purchasing and logistics service for materials and supplies for construction and start-up of process plant.
Date: 2010
Location: Sonora, México
Santa Elena Project
-Fabrication and Erection of Structural Steel
-Walls Lamination
-Electrical Installations for Illumination and Ventilation
-Louvers, Mechanical Vents Installation
Date: March 2022
Location: Sonora, México
La Yaqui Grande Project
-Fabrication and Erection of Structural Steel
-Offices and Special Rooms Constrution: Drywall, Ceiling, Walls Insulation
-Electrical Installations
-Exterior Walls Lamination and Insulation
-Furnaces Complete Installation
-Plumbing, Air, Water Piping Installation
Date: August 2021
Location: Sonora, México
La Yaqui Grande Project
-Mechanical Engineering Consultancy for Carbon Strip Process
-Motors/Pumps Selection to meet physical conditions of multiple processes
-Piping arrangements to optimize process performance
-Welders, Fitters, Mechanics and Electrics Supervision for diverse installation activities
-Comissioning of Process Plant
-Operators Supervision until Commercial Gold Production was declared
Date: March 2021
Location: El Jicaro, Nueva Segovia, Nicaragua.
San Albino Project
-Fabrication in workshop Five Coal Columns Train for 9 Tons of Coal and 900 GPM.
-Fabrication in workshop for heads tank, tailings tank, Pregnant tank, Barren tank, tanks (3) for receiving solution from yards, coal conditioning tank, coal measurement tank, dirty water tank, cyanide mixing tank, cyanide distribution, head tank, stripping solution tank, stripping solution pumping tank at the smelter outlet.
Date: 2012
Location: Sinaloa, México
El Magistral Project
-Design of silos to contain 70m3 of ammonium nitrate.
-Fabrication on workshop and Erection on site of structural steel, two silos of 35m3 capacity, stairs and miscellaneous steel.
-Design and Construction of Foundation.
Date: 2019
Location: Sonora, México
La India Mine
-Fabrication and installation of two carbon steel tanks (22 m3 each) for pregnant solution and barren solution, manufactured in our workshop, for the cyanide solution circuit for leaching.
-Installation of vertical pumps in tanks and reconnection to the existing system.
-Manufacture and installation of spliter box's, (solution distribution boxes) at the exit of the yards for selection of rich solution and/or intermediate value, change of pipes due to change of concept and trajectory.
Date: 2016
Location: Sinaloa, México
La Trinidad Mine
-Construction of culverts for diversion of streams in 3 interior roads in Mina La Trinidad, consisting of analysis of pluvial hydraulic runoff to determine the characteristics of the culverts.
Date: 2017
Location: Sinaloa, México
La Trinidad Mine
-Manufacture and installation of a stainless steel process tank with a carbon steel support structure used in the sodium sulfate process
-Installation of peripheral equipment
Date: 2017
Location: Sonora, México
Somin Mine
-Fabrication and Installation of Carbon Steel Diesel Storage Tanks of 10m3 of capacity e/a
Date: 2010
Location: Sonora, México
Mina Santa Elena
-Design and construction of a packing system in balanced food bags. 8 ton hopper of product, transport system to hopper with 46” belt conveyor, two bagging systems consisting of 2 feeders formed by a trough with a double helicoidal diameter of 30cm each. Driven with a 5hp electric gearmotor each controlled with a frequency variator. These unload the product into an automatic bagging hopper with an electronic weighing system. Once the project is deposited in the bag, it is cooked with an automatic bag cooker. <This station has the capacity to pack 600 bags of 35 Kg per hour of different products.
Date: 2019
Location: Sonora, México
Sonora Alimentos Balanceados
-Design and Fabrication on workshop of Water Storage Tank of 25m3
-Design and Fabrication of Steel Structure, ladders and miscelaneous steel
-Tank and Structural Steel Erection
Date: 2017
Location: Sonora, México
Unión Ganadera Regional de Sonora
-Design and construction of a balanced feed production system based on a Rotomix 920-18XD commercial mixer, electronic weighing system, finished product transportation system, enabled and installation of a molasses and fat storage and handling system, automation, monitoring and remote control of motors and system operations supported with vision systems. Remote controlled truck loading system.
Date: 2018
Location: Sonora, México
Sonora Alimentos Balanceados
-Elaboration of executive project of construction and process for the cracking, selection and packaging of pecan nuts.
-Construction of processing plant
- Installation of process equipment for the cracking and processing of walnuts (Nuts pralines, Nuts pralines with cinnamon, Natural walnuts, Chocolate walnuts, Glazed walnuts).
Date: 2008
Location: Hermosillo, Sonora
AgroProcesamientos de Sonora
-Development of project to improve the conditions of the balanced feed plant in order to increase production.
-Execution of a production process reengineering project to double daily production from 70 to 140 tons of food with improvements in all areas and substantial modifications by applying state-of-the-art technology in the process.
-Date: 2018
Location: Sonora, México
Unión Ganadera Regional de Sonora
-Executive project development
-Comprehensive execution of the work: civil works, electrical installations, manufacture and installation of metal structure, installation of roofs, drainage system, bathrooms, façade, etc. In an area of 4000 m2.
Date: 2013
Location: Hermosillo, Sonora, México
Molina Group
-Fabrication of structural steel on workshop
-Structural Steel Erection
Date: 2015
Location: Puerto Peñasco, Sonora
Gobierno Federal Mexicano
created with